BASIN CASE STUDY · ROD & PC PUMP

From two trial wells to 147,000 lined joints, and a WFES lining facility in the field

California Resources Corporation · San Joaquin Basin, California

In 2002 two California wells were failing on bare steel tubing in under 100 days. Lining the operator's own inspected used tubing took them past 250 days with no measurable wear. That trial has grown into roughly 147,000 lined joints across more than 1,300 wells, a tracked service record averaging 3,257 days per well, and a WFES lining facility operating in the field alongside the wells it serves.

147,000 JOINTS

1,300 WELLS · 3,257 DAY AVERAGE RUN

View case study

SINGLE WELL CASE STUDY · ROD PUMP

Ultratube™ lined tubing: 2,500 days of production from a well on its way to abandonment

The Walking-O · Delaware Basin, Permian

A Delaware Basin well was failing every 101 days due to holes in tubing and parted rods, and the operator was considering abandoning it. A US$45,000 Ultratube™ liner installed in the high side load sections took it to 1,409 days on a single run. It has now produced for close to seven years.

2,500 DAYS

AND STILL PRODUCING

View case study

FIELD CASE STUDY · PROGRESSIVE CAVITY PUMP

Polycore™ lined tubing pulled fit for service after 12+ years downhole

Consort, Alberta · Western Canadian Sedimentary Basin

Tubing was failing every seven months across 23 corrosive progressive cavity wells. Lining used tubing with Polycore™ took the field past twenty-five months and returned more than US$650,000 from a single well, on a liner costing under US$15,000.

$650K+

RETURNED FROM ONE WELL

View case study