SINGLE WELL CASE STUDY · ROD PUMP

Ultratube™ lined tubing: 2,500 days of production from a well on its way to abandonment

The Walking-O was failing every 101 days on holes in tubing and parted rods, and the operator was considering abandoning it. Lining only the sections under high side load with Ultratube™ and removing the rod guides took it to 1,409 days on a single run, and into its seventh year of production.

The Walking-O · Delaware Basin, Permian · Oil production with sucker-rod pumping

01 — RECOVERED

2,500 DAYS

OF PRODUCTION FROM A WELL ON ITS WAY TO ABANDONMENT

02 — RUN LIFE

14X

101 DAYS BETWEEN PULLS TO 1,409

03 — LINED-TUBING INVESTMENT

$45K

LESS THAN ONE OF THE $75,000 WORKOVERS IT REPLACED

04 — SIDE LOAD

500+ LB

NEAR SURFACE, THE REASON IT KEPT FAILING

Highlights

  • 500lbs: Lining confined to the sections under high side load (500+lbs), 58 joints rather than the full string.
  • The well remains in production, 2,510 days after the liner went in.
  • The shortest run before lining was 34 days.
  • Molded rod guides removed from the lined sections and not replaced.
  • Modelled power loss along the rod string fell from 14.79 to 9.39 horsepower, a cut of over 36 percent.
  • No holes-in-tubing (HIT) reported at either the 2020 pull or the 2024 pump change.
  • Lining confined to the sections under high side load, 58 joints rather than the full string.
  • Rod loading reduced from 80 to 74 percent of the Superod guideline.
  • The pumping unit gearbox returned to within its rating, from 99.4 to 94.5 percent.
  • Net pumping capacity raised from 186 to 200 barrels a day at an assumed 80 percent efficiency.
  • Most of the recovered lined tubing remained usable and returned to the operator’s inventory for redeployment.

Full case study

Background

Following conversion to rod pumping, a Delaware Basin well began underperforming, resulting in seven workovers for tubing holes and parted rods. Molded rod guides had not resolved the failure mode, and the operator considered abandoning the well.

In December 2019, the operator installed 58 joints of Ultratube™-lined 3½-inch L-80 tubing in the sections experiencing high side loads and removed the rod guides.

Seating Nipple Depth: 9,500 ft / approximately 2,895 m

Previous Runtime Average: 101 days

Average Workover Cost: approx $75,000

Total Liner Investment: approx $45,000

Pulling the Line

In July 2020, the well was pulled after 216 days because solids had stuck the pump. After installing four new Ultratube™-lined joints, the next documented pull occurred in May 2024 for a pump change (1,400 days) at nearly 14x the historical average. The lined design also reduced modelled power losses along the rod string by over 36%, indicating less power was consumed overcoming resistance within the well.

In both the 2020 pull and the 2024 pump change, no holes-in-tubing were reported.

Results

The total liner investment was less than the average cost of a single workover, while targeted lining helped keep a well threatened with abandonment in active production. Design modelling showed lower equipment loading and net pumping capacity increasing from 186 to 200 barrels per day at an assumed 80% efficiency.

The recovered lined tubing was inspected rather than scrapped. A large majority remained fit for further service and was returned to the operator’s inventory for redeployment in another well.

The well has not been pulled since the May 2024 pump change and remains in production, 2,510 days after the liner went in.

Economics

What the old failure rate would have cost

What the old failure rate would have cost
Since relining, it has taken two, with a total lined-tubing investment of $45,000. Cumulative workover cost across the 2,510 days since the liner went in. At the pre-lining run time of 101 days the well would have needed twenty-four pulls at about $75,000 each, US$1,800,000 in total. It has taken two, and the liner itself cost $45,000. The grey line is not money saved, it is money no operator would have spent on a well this size, which is why abandonment was the alternative.

Rod string design, modelled before and after

ParameterOriginal designLined tubing design
Rod guidesMolded, 6 per rodNone
Power required43.54 hp40.21 hp
Polished rod power31.56 hp27.43 hp
Power lost along rod string14.79 hp9.39 hp
Maximum rod load31,584 lb30,385 lb
Rod loading, percent of Superod guideline80%74%
Percent of reducer rating99.4%94.5%
Net pump capacity at 80% efficiency186 BPD200 BPD

Well & Field Profile

Well
The Walking-O
Service record
Installed December 2019; last pulled May 2024; remains in production as of October 2026
Operator
Major exploration and production company (since acquired)
Basin
Delaware Basin, Permian
Location
West Texas, USA
Service
Oil production
Lift method
Sucker-rod pump
Well profile
Deviated, high side loads
Seating nipple depth
9,500 ft
Tubing specification
3-1/2" L-80
Lined interval
58 joints, deviated sections only, plus four added July 2020
Liner solution
Ultratube™ (PPS)
Liner investment
Approx $45,000 in total
Average run time before
101 days
Longest run after
1,409 days
Current run
885 days and counting
Total since lining
2,510 days
Holes-in-tubing (HIT) since lining
None reported
Installation date
December 2019
PRODUCTION REFERENCE
24-hour well test, 26 June 2020
NEAR-SURFACE SIDE LOAD
500+ lb
TOTAL LINED-TUBING INVESTMENT
Approximately US$45,000
LINER-ONLY COST AT INSTALLATION
US$11/ft
COMBINED PIPE AND LINER COST AT INSTALLATION
US$20/ft

BASIN CASE STUDY · ROD & PC PUMP

From two trial wells to 147,000 lined joints, and a WFES lining facility in the field

California Resources Corporation · San Joaquin Basin, California

In 2002 two California wells were failing on bare steel tubing in under 100 days. Lining the operator's own inspected used tubing took them past 250 days with no measurable wear. That trial has grown into roughly 147,000 lined joints across more than 1,300 wells, a tracked service record averaging 3,257 days per well, and a WFES lining facility operating in the field alongside the wells it serves.

147,000 JOINTS

1,300 WELLS · 3,257 DAY AVERAGE RUN

View case study

FIELD CASE STUDY · PROGRESSIVE CAVITY PUMP

Polycore™ lined tubing pulled fit for service after 12+ years downhole

Consort, Alberta · Western Canadian Sedimentary Basin

Tubing was failing every seven months across 23 corrosive progressive cavity wells. Lining used tubing with Polycore™ took the field past twenty-five months and returned more than US$650,000 from a single well, on a liner costing under US$15,000.

$650K+

RETURNED FROM ONE WELL

View case study