BASIN CASE STUDY · ROD & PC PUMP

From two trial wells to 147,000 lined joints, and a WFES lining facility in the field

Bare steel tubing in these California wells was failing in two to three months. Rather than keep buying new pipe, the operator began lining its own inspected and rethreaded used tubing. Two trial wells in 2002 ran past 250 days with no measurable liner wear. More than two decades later the record covers roughly 147,000 lined joints across more than 1,300 wells, and WFES runs a lining facility in the field alongside them.

California Resources Corporation · San Joaquin Basin, California · Oil production on rod and progressive cavity pump

01 — SCALE

147,000

JOINTS LINED AND RUN ACROSS MORE THAN 1,300 WELLS

02 — RUN LIFE

3,257 DAYS

AVERAGE PER WELL, CLOSE TO NINE YEARS IN THE GROUND

03 — LONGEST RUN

20 YEARS

ONE LINED STRING, ONE WELL, NOT PULLED ONCE IN BETWEEN

04 — IN THE FIELD

TAFT, CA

A WFES LINING FACILITY OPERATING ALONGSIDE THE WELLS

Highlights

  • Two trial wells in 2002, both failing on bare steel in under 100 days, ran past 250 days with no measurable liner wear on downhole caliper survey.
  • Roughly 52,000 lined joints are downhole and in service today.
  • Under one percent of lined joints are recorded against a liner failure.
  • Ultratube™ came in where side loads exceeded what polyethylene could carry, and has been running in the basin since 2012.
  • WFES lines the tubing in the field at Taft, removing the round trip to a distant plant, cutting freight and road miles on every joint, keeping loaded trailers off public highways, and returning recovered pipe to service sooner.

Full case study

Background

Across these California fields, corrosion, rod-on-tubing wear, and abrasion from produced solids were contributing to bare steel tubing failures within two to three months. Replacing a failed string carried the cost of new steel in addition to the workover itself.

In 2002, the operator began lining its own used green-band tubing with Western Falcon’s HDPE liner, after inspection and rethreading, to protect the tubing internally. The liner cost less than replacement with new bare steel, reducing tubing spend while returning joints previously designated as scrap to service.

Two wells that had been failing in under 100 days were selected for the initial installations.

Pulling the Line

Downhole caliper surveys at 250 days found no measurable wear on either trial string.

One string installed in the West Shallow Oil Zone at Elk Hills during that first year remained in the well until August 2022, more than twenty years of downhole service, with no intervening pull recorded.

Recovered lined tubing is inspected rather than scrapped, while qualifying joints are returned to the operator’s inventory for redeployment in other wells.

Results

Successful trials supported wider deployment across beam pumped and progressive cavity pumped wells, reaching more than one million metres of lined tubing in over 500 wells in early documented accounts.

Where side loads exceeded the capability of the polyethylene liners, Ultratube™ was introduced. The earliest Ultratube™ installations in the record date to 2012, with the longest-running string remaining in the same well beyond 4,900 days.

As deployment volumes increased, WFES established a lining facility at Taft, California, on the operator’s site. Tubing is recovered, inspected, lined, and returned without leaving the area it serves, while WFES maintains the service record for every lined string by well.

The program has continued across a change of operator and multiple commodity cycles, and remains in active deployment more than two decades after the initial trials.

The Record

How long lined tubing stays in the well, area by area

How long lined tubing stays in the well, area by area
Average time a lined string stays in the well, by area, against the bare steel baseline published in 2002. The grey bar is the problem the program was built to solve. Across all areas, including the Ultratube™ wells, the record covers 147,295 joints in 1,306 wells and 4,253,950 days of service. Figures are computed from the CRC North inventory record as of 7 July 2026.

Condition of the lined joints

Across 144,798 polyethylene lined jointsJointsShare
Recorded against a liner failure1,3760.95%
Recorded against a wall failure3,5722.47%
No failure recorded139,85096.6%

Program Profile

Operator
California Resources Corporation
Basin
San Joaquin Basin
Location
Central California, USA
Fields in the record
Elk Hills (East and West Shallow Oil Zones, Stevens), Central Valley operations, Buena Vista
Service
Oil production
Lift methods
Sucker-rod pump and progressive cavity pump
Bare steel run life before lining
Two to three months
Tubing lined
The operator's own stock, inspected and rethreaded, both used and new
Tubing sizes
2-7/8" and 3-1/2"
Liner solutions
HDPE and heavy wall polyethylene, with Ultratube™ under high side load
Joints lined and run
147,295
Wells
1,306
Average run per well
3,257 days
Longest single run
7,326 days, just over twenty years
Strings in the ground today
Approximately 1,300, holding about 52,000 joints
Lining facility
Taft, California, operated by WFES on the operator's site
Service record as of
7 July 2026

SINGLE WELL CASE STUDY · ROD PUMP

Ultratube™ lined tubing: 2,500 days of production from a well on its way to abandonment

The Walking-O · Delaware Basin, Permian

A Delaware Basin well was failing every 101 days due to holes in tubing and parted rods, and the operator was considering abandoning it. A US$45,000 Ultratube™ liner installed in the high side load sections took it to 1,409 days on a single run. It has now produced for close to seven years.

2,500 DAYS

AND STILL PRODUCING

View case study

FIELD CASE STUDY · PROGRESSIVE CAVITY PUMP

Polycore™ lined tubing pulled fit for service after 12+ years downhole

Consort, Alberta · Western Canadian Sedimentary Basin

Tubing was failing every seven months across 23 corrosive progressive cavity wells. Lining used tubing with Polycore™ took the field past twenty-five months and returned more than US$650,000 from a single well, on a liner costing under US$15,000.

$650K+

RETURNED FROM ONE WELL

View case study