FIELD CASE STUDY · PROGRESSIVE CAVITY PUMP

Polycore™ lined tubing: fit for service after 12+ years downhole

Tubing was failing every seven months across 23 corrosive progressive cavity wells near Consort. Lining used tubing with Polycore™ took the field past twenty-five months, and one string past twelve years.

Consort, Alberta, Canada · Western Canadian Sedimentary Basin · Oil production with progressive cavity pumps

01 — RETURN

$650K+

USD FROM A LINER COSTING UNDER $15,000

02 — SERVICE LIFE

12 YRS

ONE STRING, STILL FIT FOR SERVICE AT PULL

03 — WORKOVERS

6

AVOIDED PER WELL IN FIVE YEARS

04 — CONDITIONS

350 RPM

PCP SPEED IN 8% CO₂ BRINE, 95%+ WATER CUT

Highlights

  • Used tubing with up to 50 percent wall loss returned to service instead of being scrapped.
  • The liner cleared its own cost in month seven, on the first workover avoided.
  • Average failure interval across the 23 wells rose from under seven months to over twenty-five.
  • Roughly thirty production days per well recovered over five years, at five lost days per workover.
  • Tubing workovers replaced by pump workovers, removing the 20 percent string replacement from each event.
  • Chemical inhibition program avoided entirely.

Full case study

Background

Over 23 progressive cavity wells studied near Consort, corrosion and rod-on-tubing wear contributed to failures averaging less than seven months. Rod centralizers, tubing anchors, and vibration dampers had not resolved the ongoing problems.

In 1998, the operator began lining their used 3.5″ green-band tubing with Western Falcon’s Polycore™, an HDPE liner built to protect tubing from corrosion and rod wear. The liner cost less than replacement with new bare steel, reducing recompletion costs while protecting tubing previously designated as scrap.

Pulling the Line

In May 2014, one well lined in 2002 was pulled after more than 12 years of downhole service. The failure occurred not in the lined tube, as the operator had expected, but in a four-year-old boronized joint immediately above the pump stator.

While the failed component was replaced with a high-temperature PEEK-lined joint, every WFES thermoplastic-lined joint remained fit for service.

Results

Across the 23 wells studied, average failure intervals increased from less than seven months to over twenty-five months. Pumps, rods, and other components still required intervention, while the inspected lined tubing retained value and functionality for further service.

A historical single-well model (using oil at US$30 per barrel) estimates US$274,000 in additional benefit over five years through increased uptime and reduced workover costs, against a liner cost of less than US$15,000. Extended across the twelve-year run life of this string, that benefit approaches US$650,000.

Economics

Cumulative net revenue, one well, five years

Cumulative net revenue, one well, five years
Cumulative net revenue for one well over 5 years (60 months). Both wells earn at the same rate. What separates them is what each one gives back. Every notch in the grey line (bare tubing) is a tubing workover, eight of them in five years. The red line (Polycore™ lined tubing) notches twice. LINED TUBING SPECIFICATION | 3.5" Polycore™ and BOTTOM HOLE TEMPERATURE | 30ºC / 86ºF

Payback against the one-time liner cost

Payback against the one-time liner cost
Cumulative advantage of Polycore™ lined tubing over bare tubing across 5 years (60 months). The liner cleared its own cost of $14,700 in month seven, at the exact point the bare-tubing well went down for its first workover, and reached $274,226 by month sixty. Everything after month seven is a return. LINED TUBING SPECIFICATION | 3.5" Polycore™ and BOTTOM HOLE TEMPERATURE | 30ºC / 86ºF

Well & Field Profile

Location
Consort, Alberta, Canada
Basin
Western Canadian Sedimentary
Service
Oil production
Lift method
Progressive cavity pump
Pump speed
Up to 350 RPM
Well profile
Severely deviated to horizontal
Fluid rate
Up to 1,600 BPD
Water cut
Over 95%
CO₂ content
8% in produced gas
Oil gravity
20 to 25 API
Liner solution
Polycore™
Service duration
12+ years, one string
Pull date
May 2014

BASIN CASE STUDY · ROD & PC PUMP

From two trial wells to 147,000 lined joints, and a WFES lining facility in the field

California Resources Corporation · San Joaquin Basin, California

In 2002 two California wells were failing on bare steel tubing in under 100 days. Lining the operator's own inspected used tubing took them past 250 days with no measurable wear. That trial has grown into roughly 147,000 lined joints across more than 1,300 wells, a tracked service record averaging 3,257 days per well, and a WFES lining facility operating in the field alongside the wells it serves.

147,000 JOINTS

1,300 WELLS · 3,257 DAY AVERAGE RUN

View case study

SINGLE WELL CASE STUDY · ROD PUMP

Ultratube™ lined tubing: 2,500 days of production from a well on its way to abandonment

The Walking-O · Delaware Basin, Permian

A Delaware Basin well was failing every 101 days due to holes in tubing and parted rods, and the operator was considering abandoning it. A US$45,000 Ultratube™ liner installed in the high side load sections took it to 1,409 days on a single run. It has now produced for close to seven years.

2,500 DAYS

AND STILL PRODUCING

View case study