Built for Uptime, Lift Efficiency, & Evolving Well Conditions

Production & CONVERSION Tubing Solutions

Production wells only create value if they are built to stay online. When tubing fails, the costs compound, with lost production stacked on top of the intervention itself.

WFES builds tubing packages around the current and future demands of the well, evaluating rod wear, corrosion, friction, and fluid composition so the string returns its cost through longer runtime, lower chemical and power spend, and fewer interventions.

// Factors working against reliable production

Production Well
Challenges

Every production well carries its own mode of failure. When the imminent failure is a hole in tubing (HIT), WFES matches the solution to the cause: IS+ domestic ERW, Arvedi SRM as a 1% and 3% chrome seamless alternative, or lined tubing for high-corrosion, high side-load wells. Remove HIT as your failure mode.

Production Well Challenges

Rod Wear & Corrosion

Friction Loss & Lifting Efficiency

Changing Production & Lift Methods

HIT Before Pump Change

// Custom solutions for your basin

Your Tubing
Technology Partner

A production tubing strategy can begin at completion. For wells later in their lifecycle, WFES supports steel, processing, lining, and connection decisions that remove an imminent HIT failure or prevent the next premature one.

Steel Selection

Depending on your lift method and the long-term needs of the asset, WFES supports the selection of domestic ERW or Arvedi SRM as a 1% and 3% chrome seamless alternative.

Processing & Verification

WF Processing performs every step to IS+ standards, from heat treatment and extended upsets to tighter thread tolerances and independent third-party verification, so the full tubing package performs consistently.

Liner Technology

WFES helps production operators determine whether lining the full string, lining high-risk sections, or lining used pipe is advisable for the application, reducing repeat HIT failures and workover exposure.

Connections & Compatibility

Through WF connection partners, WFES matches tubing connections to your lift method, side loads, and operating goals.

// Fit-for-purpose solutions throughout the wells lifecycle

Match Your Tubing Strategy to the Lift Method

Production wells do not fail in the same way across each lift method, and each evolution can place different mechanical, chemical, and operational demands on the tubing string.

Well Phase Challenges

ESP

Challenges:

  • Hole in tubing (HIT)
  • High fluid volume
  • Corrosion exposure
  • Intervention cost
  • Changing production conditions

Gas Lift

Challenges:

  • HIT
  • Pressure cycling
  • Continuous gas and fluid movement
  • Changing flow conditions
  • Multiphase flow dynamics

PC Pump

Challenges:

  • HIT
  • Excessive torque and vibration
  • Mechanical contact
  • Elastomer compatibility issues
  • High-viscosity fluids and surface resistance

Rod Lift

Challenges:

  • HIT
  • Rod on tubing wear
  • Coupling contact
  • Side loading
  • Sand and fluid friction

Late-Life Conversions

Challenges:
  • Imminent HIT
  • Changes in lift strategy
  • Steel recovery
  • Basin-specific reconfiguration
  • Injection or disposal use

How Western Falcon Supports Operators Across Lift Phases

As your technical partner, WFES can determine how your well can be best served by our integrated platform, resulting in a tubing package tailored to the well’s actual production and economics.

WF Steel

Match the metallurgy to your well conditions with domestic ERW or Arvedi SRM as a 1% and 3% chrome seamless alternative. IS+ chemistry, a minimum grain size of 7, and 95RBW targets set the baseline above industry standard.

Related Solutions

WF Connections

Through multiple connection alliances, WFES helps match connection selection to the unique demands of your well.

Related Solutions

WF Processing

Match the processing to the metallurgy and well conditions, with increased mechanical properties, additional testing, and independent third-party verification.

Related Solutions

WF Liners

Further improve your tubing ROI with a long-term solution that addresses both wear and corrosion.

Related Solutions

Lining Used Pipe

WFES assesses whether customer-owned used tubing can be repaired and lined for the future demands of the well, including shallow, low-temperature production wells.

Related Solutions

// Supporting tomorrow’s production today

Why Approach Production
Wells as Lifecycle Assets

With well lifecycles spanning decades, production tubing is a decision that quietly sets future capital potential. A low-cost string at initial production can become expensive if it increases workover frequency, shortens run time, raises lifting cost, or fails to support future production changes. WFES helps operators evaluate production tubing around long-term asset value. By aligning steel selection, processing, liner technology, and connection strategy with the well’s lift method and failure mode, operators can reduce exposure to recurring interventions and support more reliable production over time.

// Backed by field data

Western Falcon
Production Wells

Case Study

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Mauris dapibus metus at eleifend pretium.

case study

Case Study

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Mauris dapibus metus at eleifend pretium.

case study

Case Study

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Mauris dapibus metus at eleifend pretium.

case study