Built for Uptime, Lift Efficiency, & Evolving Well Conditions

Production Tubing Solutions

Production wells only create value if they are built to stay online. When tubing failures, rod wear, corrosion, friction, or lift-system issues disrupt production, your costs are compounded by lost revenue and the intervention cost.

Western Falcon Energy Services helps operators build production tubing packages based on how and where the well actually produces. By evaluating the evolving internal and external factors that strings must withstand, WFES supports tubing strategies that reduce repeat failures and improve long-term production reliability.

// Factors working against reliable production

Production Well
Challenges

Every production well carries a different failure risk. Some wells crack through tubing and coatings due to rod wear. Some fail because of corrosion, fluid chemistry, or produced water. Others lose efficiency through friction, high rod load, repeated workovers, or changing production requirements.

Production Well Challenges

Rod Wear & Mechanical Contact

Corrosion & Fluid Compatibility

Friction Losses & Lifting Efficiency

Changing Production & Intervention Requirements

// Production strategies built from your field data

Your Tubing
Technology Partner

A production tubing strategy should account for more than today’s operating profile. When approaching new drills, production, or late-life applications, WFES evaluates the lift method, fluid profile, failure history, production goals, and lifecycle plan before aligning the full tubing package with your specific well.

Steel Selection

WFES helps operators evaluate domestic and international ERW pathways, Arvedi SRM as a seamless or high-chrome alternative, and application-specific metallurgy requirements based on corrosion exposure, pressure, temperature, rod wear, artificial lift strategy, and long-term service goals.

Processing & Verification

Prepare tubing for field reliability before it goes downhole. WFES-supported processing can include heat treatment, extended upsets, tighter thread tolerances, hydrotesting, inspection, thread verification, and independent third-party quality controls, as required by the tubing package.

Liner Technology

Protect the tubing ID from corrosion, rod wear, fluid friction, and repeat failure cycles. In addition to increased production efficiency and longevity, Western Falcon liner technology has been documented for use in high-side-load rod-lift environments, including applications where rod-on-tubing wear has historically driven tubing failure.

Connections & Compatibility

Complete the tubing package with connection and coupling requirements matched to the production system, liner or coating system, installation practices, service conditions, and long-term reliability needs. WFES helps ensure the connection strategy does not become the weak point in the production string.

// Fit-for-purpose solutions from initial string to late-life

Match Your Tubing Strategy to the Lift Method

Production wells do not fail in the same way across systems, and each evolution can place different mechanical, chemical, and operational demands on the tubing string.

Well Phase Challenges

ESP

Challenges:

  • High fluid volume
  • Corrosion exposure
  • Intervention cost
  • Changing production conditions

Gas Lift

Challenges:

  • Pressure cycling
  • Continuous gas/fluid movement
  • Changing flow conditions
  • Multiphase flow dynamics

PC Pump

Challenges:

  • Excessive torque and vibration
  • Mechanical contact
  • Elastomer compatibility issues
  • High-viscosity fluids and surface resistanc

Rod Lift

Challenges:

  • Rod-on-tubing wear
  • Coupling contact
  • Side loading
  • Sand and fluid friction
  • Hole-in-tubing failures

Late-Life Production & Conversions

Challenges:

  • Changes in lift strategy
  • Steel recovery
  • Basin-specific reconfiguration
  • Injection or disposal use

How Western Falcon Supports Operators Across Well Phases

WF Steel

Long-term reliability in corrosive downhole conditions.

Related Solutions

WF Connections

Tubing and connection strategies paired with pressure requirements, fluid profile, flow performance, and evolving production reliability.

Related Solutions

WF Processing

In-house coordination helps operators balance tubing body and finishing requirements with third-party testing before field handling can affect run life.

Related Solutions

WF Liners

Improved downhole resilience with resistant thermoplastic lining.

Related Solutions

Relining Used Pipe

WFES helps assess whether tubing should be replaced, lined, relined, reprocessed, or built around the next stage of the asset lifecycle.

Related Solutions

As your technical partner, WFES can determine how your well can be best served by our integrated platform, resulting in a combined tubing package tailored to the well’s actual production and economics.

// Supporting tomorrow’s production today

Why Approach Production
Wells as Lifecycle Assets

With well lifecycles spanning decades, production tubing is a decision that quietly sets future capital potential. The lowest-cost string at installation can become expensive if it increases workover frequency, shortens run time, raises lifting cost, or fails to support future production changes. WFES helps operators evaluate production tubing around long-term asset value. By aligning steel selection, processing, liner technology, and connection strategy with the well’s lift method and failure mode, operators can reduce exposure to recurring interventions and support more reliable production over time.

// Backed by field data

Western Falcon
Production Wells

Case Study

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Mauris dapibus metus at eleifend pretium.

case study

Case Study

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Mauris dapibus metus at eleifend pretium.

case study

Case Study

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Mauris dapibus metus at eleifend pretium.

case study