Based on Earl Sperling’s presentation | Canadian Artificial Lift Conference | February 28, 2018

Thermoplastic Liners to Reduce Rod Load and Downhole Failures in Pumping Wells

Thermoplastic-lined tubing helps pumping wells run longer by reducing friction, rod-on-tubing wear, and corrosion. Field examples show how these benefits can reduce workovers and lower lifting costs.

Table of Contents

Abstract

Thermoplastic-lined tubing offers a cost-effective way to reduce downhole failures by addressing corrosion, rod-on-tubing wear, and friction within the same tubing string. These challenges intensify in deviated and horizontal pumping wells, where setting the pump in the build section increases contact loads between the rod string and tubing. A lower-friction thermoplastic surface can reduce the frictional component of rod load while protecting the steel tubing wall. Coupling-friction testing and a Duvernay rod-load model illustrate the mechanical benefit. Field examples from beam and progressive cavity pump wells show longer tubing service, less frequent intervention, and lower operating demand. In a Grand Forks PCP well, reported torque fell from 1,045 to 300 ft-lb at the same pump speed and fluid production rate. A Worsley economic model projected CAD 611,177 in cumulative benefit over 60 months, excluding energy savings. Together, the examples show how liner selection and well diagnostics can support longer run life and lower lifting costs.

Why horizontal pumping wells place greater demands on tubing

Horizontal drilling and pad development create opportunities to increase production, but they also change pumping-well loading conditions. Lowering the bottomhole pump into the bend can improve production while increasing rod contact with the tubing through the build section. Conventional rod and tubing designs may then require more capital and more frequent workovers.

In a beam pumping well, the surface unit drives the sucker rod string back and forth to operate the downhole plunger. In a progressive cavity pump (PCP) well, the surface drive rotates the rod string to turn the pump rotor. Both arrangements transmit motion through rods inside the production tubing. As the well changes direction, contact between those components creates friction and wear.

Failures include rod breaks, overload or buckling, rod-on-tubing wear, and corrosion damage. Higher rod load also increases energy demand. The design challenge is therefore to reach a productive pump setting while controlling the mechanical and corrosion-related operating costs.

Protecting the tubing wall against corrosion and rod wear

Corrosion and rod wear can act on the same area of the tubing wall. The corrosive-wear schematic shows a moving contact passing across corrosion products on a metal surface. Repeated contact disturbs that surface layer while corrosion continues at the wall. This combination helps explain why reducing metal contact and protecting the tubing interior are connected objectives.

Schematic of a moving contact across corrosion products on a metal surface, illustrating the combined action of corrosion and wear.
Figure 1 – Corrosive wear combines surface contact with corrosion at the tubing wall.
Source: Canadian Artificial Lift Conference 2018, slide 8.

Common corrosion-control methods include metallurgy changes, chemical treatment, internal plastic coatings, and thermoset or thermoplastic liners. Rod-wear controls include moulded and roller rod guides, rod and tubing rotators, tubing anchors, continuous rod, spray metal rod couplings, and surface treatments.

Thermoplastic-lined tubing places a polymer surface between the moving rod string and the steel tubing interior. The liner provides a corrosion and wear barrier while creating a smoother contact surface for the rods and couplings. The cutaway connection illustrates the lined flow passage inside the steel tubing.

Cutaway view of a tubing connection showing the polymer-lined interior within the steel tubular.
Figure 2 – Lined tubing connection cutaway.
Source: Canadian Artificial Lift Conference 2018, slide 11.

The comparison with moulded rod guides is significant. Guides address rod contact at specific locations but do not protect the tubing interior from corrosion. The lined-tubing approach combines tubing-wall protection with reduced rod friction, supporting longer rod fatigue life and deeper pump placement.

Reducing friction and rod load

Rod load includes rod weight and friction. The frictional force on a sucker rod depends on the coefficient of friction and the side load at the contact. Reducing the coefficient of friction lowers that frictional contribution for a given side load.

Coupling-friction work funded and supported by ConocoPhillips compared HDPE-lined tubing with bare steel tubing. The plotted HDPE-to-steel drag ratio remains below one and rises with temperature: the lined-tubing coupling drag is approximately one-half to two-thirds of the steel value across the plotted range. The presentation cites the work of Mike Berry, Rob Davis, and John Patterson at the 2009 Permian Basin Artificial Lift Forum.

Chart showing an HDPE-to-steel coupling drag ratio below one across the plotted temperatures, increasing from approximately 0.51 to 0.65 as temperature rises.
Figure 3 – HDPE-to-steel coupling drag ratio plotted against temperature.
Source: Canadian Artificial Lift Conference 2018, slide 15.

For rod-load prediction, the presentation identifies S-ROD default coefficients of 0.20 for bare rods and 0.30 when moulded rod guides are used. It proposes a target coefficient of 0.12 for thermoplastic-lined tubing, based on an assumed 35% to 45% reduction relative to bare tubing and sucker rods. Dynamometer comparisons before and after lining can help refine the coefficient used for a particular well.

Duvernay horizontal well rod-load model

The Duvernay example compares four designs using end-user modelling information. The designs kept the pump stroke rate and rod type and size the same. At the shared modelled depth of 2,900 m, the thermoplastic-lined design reduced the predicted rod load from 97% to 85% of allowable load and the maximum side load from 324 to 311 lb per rod.

Duvernay beam pump rod-load predictions
DesignDepth (m)COFRod load (% of allowable)Maximum side load (lb/rod)
All moulded rod guides3,0750.42147461
Moulded and roller rod guides3,0750.02–0.4287356
No rod guides2,9000.2097324
TPL tubing with no rod guides2,9000.1285311

Source: Canadian Artificial Lift Conference 2018, slide 17.

The initial moulded-and-roller-guide design had operability issues. The recommended design used Ultratube™ lined tubing with spray metal rod couplings. The model shows how the friction input affects the load calculation and the available design margin.

Connecting lower load with rod fatigue life

Rod fatigue depends on the relationship between stress amplitude and cycles to failure. Higher stress amplitudes lead to failure after fewer cycles, while lower amplitudes allow more cycles. Reducing repeated loading from rod friction therefore supports longer fatigue life. Thermoplastic-lined tubing aims to lower rod load while protecting the tubing from contact wear.

Maintaining flow performance through a smoother tubing surface

The liner also changes the surface over which produced fluids flow. The surface-roughness values presented were 0.00006 inches for Polycore™ lined tubing and 0.0018 inches for new bare tubing: a 30-fold difference. Corrosion can make bare tubing rougher during service, further increasing flow resistance.

In the example presented, a liner reduces the internal diameter by approximately 0.30 inches, or 7.6 mm. Even with that smaller flow passage and the resulting higher velocity, the comparison at 2,500 barrels per day shows lower pressure loss for lined tubing in both 2⅞-inch and 3½-inch API sizes. The smoother surface offsets the diameter restriction in this comparison.

This flow benefit complements the reduced rod-contact friction. It addresses the resistance to moving fluid through the tubing, while the coupling-friction comparison addresses the mechanical interaction between the rod string and the tubing surface.

Selecting the liner for the well environment

Liner selection begins with operating temperature, predicted side load, fluid and gas conditions, and the well’s failure history. The product range presented includes Polycore™ HDPE, Enertube™ polyolefin, Ultratube™ polyphenylene sulphide, and Extremetube™ PEEK liners. Different polymers provide options for different temperature, chemical, and mechanical demands.

For deviated and horizontal wells, predicted side load is particularly important. Pressure-volume-temperature information and acid-gas conditions also inform polymer selection because thermoplastic liners are permeable to acid gases. Previous rod, tubing, and pump failures help identify where protection is most needed.

Lined tubing adds a small amount of weight and creates an internal-diameter restriction. Handling and running procedures remain important: thread protectors should stay in place until connection make-up and be replaced after breakout. Rod and coupling condition must also suit the application, as the field examples demonstrate.

Field experience in beam pumping wells

Virden area wells

A Virden-area producer operated vertical and horizontal beam pumping wells at typical true vertical depths of 950 to 1,050 m and bottomhole temperatures of 25°C to 35°C. In horizontal wells, pumps were set at 70° to 90° from vertical. Rod-on-tubing wear, corrosion, and rod breaks limited the worst wells to approximately 10 months of run life.

The producer began installing Polycore™ lined tubing in problem wells in June 2013, using 2⅞-inch and 3½-inch lined tubing. At the time of the conference presentation, the producer had lined 110 wells, with only pump change-outs reported after lining. The producer reported lower minimum polished-rod loads, a reduced potential for rod buckling, and payout in less than 10 months.

Southeast Saskatchewan Bakken wells

In southeast Saskatchewan, a Bakken producer lowered pumps into the build section at 65° to 70° from vertical to increase oil production. The wells were approximately 1,500 m true vertical depth, with a build rate of 15° per 30 m and a bottomhole temperature of 69°C. Rod breaks associated with buckling had been an issue without lined tubing.

The programme used 3½-inch Ultratube™ lined tubing with spray metal rod couplings in the build section. More than 50 beam pumping wells were lined over three years. One reported exception involved severe corrosion in the middle of a sucker rod, where sharp edges cut the liner. The recommended response was to use 10-foot pony rods with spray metal couplings through the build section to minimize contact with the rod body.

North Dakota Bakken wells

North Dakota Bakken wells presented deeper and hotter service conditions: true vertical depths of 2,440 to 3,050 m, bottomhole temperatures of 100°C to 138°C, and typical predicted side loads of 300 to 400 lb per rod, with some wells reaching 800 lb per rod. Corrosion and rod-on-tubing wear were major problems in the build section.

After trying several approaches, the reported most effective way to extend tubing life was Ultratube™ lined tubing with connected rods and spray metal couplings. Over the three years described, more than 200 beam pumping oil wells used that combination. Liner shavings were reported where standard mild-steel rod couplings corroded and developed sharp edges, reinforcing the importance of the rod-and-coupling design alongside the liner.

Field experience in progressive cavity pump wells

Provost field corrosion protection and long service life

Provost field deviated and horizontal PCP wells produced up to 250 m³ of fluid per day, with 95% water cut and an average of 8% CO₂ in solution gas. Tubing failures repeated after approximately seven months despite the use of moulded rod guides and corrosion inhibitor. More than 50 wells were lined with Polycore™ in the early 2000s.

A 2000 report identified average benefits of $1,262 per month per well in reduced workover costs and $1,172 per month per well in additional revenue, for a total of $2,434 per month ($29,208 annually) per well.

One well lined in 2002 was pulled after a tubing leak in May 2014. The leak was found in the boronized joint immediately above the PCP, where wear and corrosion had created a hole. The Polycore™ liner was reported to be in good condition after 12 years of service. An Extremetube™ pup joint was then installed above the PCP.

The inspection photographs show the recovered lined tubing after 12 years of service, supporting the account of its long service life in the corrosive PCP environment. In suitable injection and disposal wells, WFES lined pipe remains suitable for re-lining, greatly reducing the cost of purchasing new bare steel.

Two photographs of recovered lined tubing from the Provost PCP well after 12 years of service.
Figure 4 – Provost lined used tubing after 12 years in a PCP well.
Source: Canadian Artificial Lift Conference 2018, slide 26.

Alderson field operating comparison

An Alderson-area producer purchased 200 wells in late 2014, including 20 wells already equipped with 3½-inch Polycore™ lined tubing: 15 PCP producers and five water injectors. Typical well conditions were 1,050 m true vertical depth, 4,800 kPa bottomhole pressure, and 30°C bottomhole temperature.

In early 2015, the producer compared lined and unlined well performance over the preceding three years. The comparison considered workover frequency, rod breaks, tubing wear, corrosion, pump torque, and energy use. The producer concluded that lined tubing provided significant value and began replacing bare tubing with Polycore™ lined producer-owned used tubing during workovers.

Grand Forks field energy savings

A horizontal Grand Forks PCP well in southeast Alberta had a pump set at 908 m measured depth and 870 m true vertical depth, in the bend of the well. The well produced 240 m³ of fluid per day at 96% water cut. A December 2015 workover found severe internal pitting in much of the tubing string.

In March 2016, 334 m of 3½-inch modified Polycore™ lined blue-band used tubing was installed in the lower section. The NOV 120-1200 PCP operated at 242 rpm before and after installation, with the same reported fluid production rate. The comparison shows the change in operating demand at those shared conditions.

Grand Forks PCP operating comparison
Operating measureBefore liningAfter lining
Pump speed242 rpm242 rpm
Fluid production240 m³/day240 m³/day
Pump torque1,045 ft-lb300 ft-lb
Power reported in hp47 hp13 hp
Power reported in kW35 kW10 kW

Source: Canadian Artificial Lift Conference 2018, slide 30.

At an electricity price of $0.07 per kWh, the reported annual energy saving was $15,330, compared with $10,600 for the installed lined tubing. Energy savings alone reduced lifting cost by $0.75 per barrel of oil equivalent. Lining the full string was recommended and was estimated to cost $29,000.

Worsley field tubing and rod reuse

Worsley heavy-oil PCP wells in northwest Alberta operated with pumps at 1,050 to 1,192 m measured depth and 70° to 75° from vertical. Severe tubing and continuous-rod corrosion limited the worst wells to six months of service, with approximately 85% of the tubing and continuous rod replaced. End-user modelling predicted maximum side loads of 12 to 17 lb per foot in the build section of two wells.

Polycore™ lined yellow-band tubing was installed in several wells during the first and second quarters of 2016. In two wells lined in March 2016, the tubing was pulled in June 2017 to install larger PCPs. After 15 months, the lined tubing was in excellent condition, and the continuous rod showed only superficial corrosion. Both were run back into the wells.

Economic model for Worsley heavy oil wells

The Worsley economic model evaluates the value of extending workover intervals over 60 months. It compares a six-month workover cycle with a 24-month pump-workover cycle and includes production lost during each intervention. The initial lined-tubing investment is CAD 44,000. The assumptions below establish the production, replacement, and cost conditions used in the comparison.

Worsley economic model assumptions
Model inputValue
Start date and evaluation periodMay 15, 2016; 60 months
Tubing string depth1,100 m
Tubing costCAD 20/m
Liner costCAD 20/m
Initial lined-tubing investmentCAD 44,000
Oil price and exchange-rate assumptionUSD 30/bbl; exchange rate 1.3
Gas price and productionUSD 1.50/Mcf; trace production
Oil production rate31 bbl/day
Lifting costCAD 16.50/BOE
Average annual production decline10%
Previous workover interval6 months
Modelled pump-workover interval with lined tubing24 months
Lost production per workover5 days
Tubing string replaced per workover85%
Base workover costCAD 60,000
Discount rate6%

Source: Canadian Artificial Lift Conference 2018, slides 34, 38.

In the model, workover months push monthly revenue below zero. Those interruptions occur less frequently in the lined-tubing case, allowing cumulative revenue to grow with fewer setbacks. Avoided interventions reduce direct cost and preserve producing days.

The cumulative-benefit chart shows the same effect as a series of steps. Each avoided workover adds to the difference between the two designs. Under the model assumptions, the first avoided six-month workover takes the cumulative benefit above the initial lined-tubing investment.

Chart showing cumulative revenue improvement rising in steps as workovers are avoided, with the initial TPL cost shown as a fixed CAD 44,000 line.
Figure 5 – Modelled cumulative revenue improvement compared with the initial TPL cost.
Source: Canadian Artificial Lift Conference 2018, slide 37.

The model projects CAD 82,064.86 of benefit in the first year and CAD 611,177.36 cumulatively over five years. The table below carries the annual benefits, cumulative benefits, net present value, and internal rate of return shown in the model. Energy-consumption savings are excluded from these results.

Worsley modelled economic results
YearAnnual benefit (CAD)Cumulative benefit (CAD)Net present value (CAD)IRR
182,064.8682,064.8631,528.0087%
2163,643.47245,708.33168,926.21207%
3101,889.22347,597.55249,632.01224%
4162,507.44510,104.98371,067.02230%
5101,072.38611,177.36442,319.06232%

Source: Canadian Artificial Lift Conference 2018, slide 38.

The economic value comes from the operating cycle as a whole. Fewer workovers reduce intervention spending, reduce tubing replacement, and avoid repeated production losses. The Grand Forks example shows an additional energy-saving pathway outside the Worsley model.

Conclusions

Thermoplastic-lined tubing can extend pumping-well run life by combining a lower-friction rod contact surface with protection against corrosion and wear. The friction test and Duvernay prediction show the effect on rod loading; the beam and PCP field examples show how that protection can support longer service and lower failure frequency.

The operating benefit becomes an economic benefit when wells require fewer workovers, retain more usable tubing and rods, lose fewer producing days, or consume less energy. Predictive rod-load analysis, dynamometer diagnostics, failure history, downtime, and energy use help identify the wells where lined tubing can provide the greatest value. Selecting the polymer and rod-contact components for those conditions is central to a cost-effective design.

Source presentation

Earl Sperling. Thermoplastic Liners: A Cost Effective Option to Reduce Downhole Failures in Pumping Wells. Canadian Artificial Lift Conference, February 28, 2018.

Thermoplastic liners for your downhole operations

If your wells are experiencing recurring corrosion or rod-on-tubing wear failures, discuss the operating conditions and failure history with Western Falcon Energy Services. Share the available well data and planned treatment or intervention procedures to support a discussion of suitable materials and mitigation options.